FAQ
Questions people ask about Willow Lakes
Each answer starts with the short version. Open “More detail” for the explanation and sources.
Jump to a topic
The basics · The proposal and approvals · Power and electric bills · Water and cooling · Sound, neighbors and safety · Taxes and incentives · Jobs and other communities · Local control · Ask a question
The basics
4 questions
What is a data center?
A secure building full of computers that store and process information. Banking, medical records, business software, photo backup and streaming all run through data centers.
More detail
The building holds racks of servers, data-storage and network equipment, the electrical systems that power them and the cooling that keeps them at a safe temperature. Florida law defines a data center as a facility that primarily contains electronic equipment used to process, store and transmit digital information (Fla. Stat. §373.203).
Why do data centers use so much electricity?
They run around the clock, and both the computers and the cooling that protects them draw power. Lawrence Berkeley National Laboratory estimates U.S. data centers used about 176 terawatt-hours in 2023.
More detail
Use at one site depends on its equipment. The Willow Lakes employment brief assumes a 450 MW campus, and FPL determines the actual load through its large-load process. Source: LBNL, 2024 U.S. Data Center Energy Usage Report.
How long have data centers been around?
About three decades. Brookings’ research dataset covers about 1,500 U.S. data centers opened between 2003 and 2024, and Loudoun County, Virginia, dates its cluster to an internet exchange built nearby in the early 1990s.
More detail
Sources: Brookings; Loudoun County.
Is this decision about artificial intelligence?
No. The question before Fort Pierce is land use: where a facility belongs and under what conditions. Opinions about artificial intelligence are a separate public debate. The siting rules, power and water protections and conditions apply the same way whatever the tenant’s workload.
The proposal and approvals
5 questions
Where does the application stand?
The rezoning application (PZZAM2026-00002) was tabled at the applicant’s request on September 17, 2026, while Fort Pierce reviews how data centers fit its zoning code. No hearing is scheduled.
More detail
The City’s Planning Director told the Planning Board that the zoning code has no data-center use, that staff considers a data center closest to light industrial, and that he recommended the Board not assign a district yet and seek City Commission input instead. The Board asked staff to research the question and recommended a Commission discussion. The applicant’s attorney asked to table the application to a date uncertain, and the Board agreed. If it returns, the City gives new public hearing notice. Some press coverage called this “withdrawn”; the City’s record says tabled. The full dated record is on Status & Documents.
What is being decided now?
Land use. Willow Lakes has asked to rezone part of the property so a data center can be considered. Rezoning changes the uses the land may have. It is not approval of a site plan, engineering design, utility service, water permit, building permit or operating plan. Those follow, each with its own review.
More detail
The request is for about 174 acres of Light Industrial (I‑1) and about 26 acres of General Commercial (C‑3) on a site that is now a Planned Development approved in 2020 for a mixed-use village. A draft covenant would limit the industrial acreage to data-center use for 50 years. Rezoning decides whether a data center can be considered, and it is the first opportunity for the City to set enforceable conditions. Sources: City staff report.
What would be built?
The concept plan shows six single-story data-center buildings of about 220,000 square feet each, a substation area and about 250,000 square feet of commercial space along Midway Road. It is a concept plan, and a site plan comes later.
More detail
The draft conditions would fix a maximum “development envelope” at conditional use: building area, height, electric load, on-site generation, cooling capacity, water demand and equipment areas. Phases could proceed inside it. Source: City packet.
Who will operate it?
No operator has been announced. After rezoning, the applicant intends to partner with a data-center developer, which would file a site plan for City approval.
More detail
Conditions attached to a rezoning or conditional-use approval run with the land, so they bind whoever operates the campus.
What approvals come after rezoning?
Conditional use, final site plan and building permits from the City; service agreements with FPL under its PSC-approved rate; a water-use permit and an environmental resource permit from the water district; an air permit for generators; and roadway and drainage permits.
More detail
| Approval | Reviewed by | What it settles |
|---|---|---|
| Conditional use and site plan | City of Fort Pierce | Envelope, setbacks, sound, lighting, buffers, traffic, emergency response |
| Building, fire and electrical permits | City; fire district | Codes, fuel storage, batteries, life safety |
| Electric service agreements | FPL, under a PSC-approved rate | Load, who pays for generation and the substation |
| Water-use permit | South Florida Water Management District | Amounts allowed, conservation plan, reclaimed water, hearing |
| Environmental resource permit | South Florida Water Management District | Wetlands, stormwater, flooding |
| Air permit | Florida Department of Environmental Protection | Generator emissions |
| Roadway access and drainage | St. Lucie County; FDOT | Access, outfall, improvements |
Sources: SFWMD water-use permits; SFWMD environmental resource permits.
Power and electric bills
3 questions
Could my electric bill rise?
Florida law and FPL’s rate are designed so a data center pays for the power infrastructure that serves it. The rate covers this customer’s costs and does not set future rates for other households, which the Public Service Commission sets for many reasons.
More detail
Fla. Stat. §366.043 (effective July 1, 2026) requires utility tariffs that reasonably ensure each large-load customer, 50 megawatts or more at one location, “bears its own full cost of service,” including connection, new transmission, new generation and other infrastructure. The risk of nonpayment may not fall on other ratepayers. The statute applies to investor-owned utilities such as FPL.
Research on past prices: a Lawrence Berkeley National Laboratory and Brattle analysis of 2019 to 2024 found that state load growth tended to lower retail prices by spreading fixed costs over more load, and that new infrastructure costs can push prices up where supply is constrained. In the PJM grid of the mid-Atlantic, the market monitor attributed a large rise in capacity-auction revenue to data-center load. Virginia’s state review projected unconstrained demand could add $14 to $37 a month to typical residential bills by 2040. The LBNL deck is a scoping-level study and does not forecast prices. Sources: LBNL / Brattle; Virginia JLARC.
How do FPL’s large-load rules work?
FPL’s approved Large Load Contract Service applies to new load of 50 MW or more at an 85 percent load factor or higher. The customer pays for new generation and for connection, and commits to a long contract with a monthly minimum.
More detail
- Charges: a base demand charge of $14.61 per kW and an incremental generation charge of $11.67 per kW of contract demand (LLCS-1).
- Minimum bill: demand charges on the greater of 70 percent of contract demand or the highest billing demand in the prior 11 months, plus the generation charge on contract demand.
- Term: at least 20 years, with two years’ notice to end afterward and exit charges equal to the remaining generation charge.
- Security and construction: credit-based security, a contribution toward construction costs, and payment for system-impact studies. The customer builds and owns its substation.
- Where: LLCS-1 is offered near existing 500 kV facilities in the vicinity of Sunbreak in St. Lucie County, Tesoro in Martin County and Sugar in Palm Beach County, up to 3 GW. LLCS-2 covers other areas.
The PSC approved the rate in Order PSC-2026-0022-S-EI (January 22, 2026). Appeals of the rate settlement are pending at the Florida Supreme Court. FPL filed on October 1, 2026 to show its structure complies with §366.043, and the PSC reviews that filing. Sources: FPL tariff, Section 8; PSC order; FPL newsroom.
How much power would Willow Lakes use?
The team’s employment brief assumes a 450 MW campus of about 1.32 million square feet. FPL sets the actual load through its large-load process, with a system-impact study and service agreements, before service begins.
More detail
The 50 MW threshold in state law decides which protections apply. It is not a cap. The draft conditions would require the application to state a maximum load, and conditional use would fix it as part of the development envelope.
Water and cooling
6 questions
How much water could Willow Lakes use?
The amount will be set by engineering and permitted by the South Florida Water Management District. The applicant’s preliminary engineering assumes closed-loop cooling supplied from the on-site reservoir, with domestic and sanitary demand of about 65,500 gallons a day for the campus and commercial uses.
More detail
A water balance, the amount withdrawn, evaporated, replaced and returned, sizes the system. For scale in national totals, Lawrence Berkeley National Laboratory estimates direct water use by all U.S. data centers at about 66 billion liters (17.4 billion gallons) in 2023, plus nearly 800 billion liters (about 211 billion gallons) used at power plants to generate their electricity. The Atlantic reports that U.S. golf courses used almost 2 trillion liters that year. Virginia’s state review found that most data centers use about as much water as an average large office building, and a few use substantially more. Sources: LBNL; The Atlantic; Virginia JLARC; City packet.
What does “closed loop” mean?
The same cooling water circulates through a sealed system instead of evaporating. Loudoun County reports that older open-loop designs lost 75 to 85 percent of their cooling water to evaporation and modern closed-loop systems lose 0 to 5 percent.
More detail
Closed-loop systems still release heat, so engineering sizes the heat-rejection equipment and the make-up water. Source: Loudoun County water page.
What is the reservoir’s role?
The reservoir, about 19.6 acres in the northeast part of the property, is the planned water source for cooling, so the campus does not depend on the City’s drinking-water system for it. Engineering and the water-use permit establish how much water it can supply and under what operating limits.
More detail
The City’s staff report repeats the applicant’s statement that the reservoir was excavated for aggregate mining; the environmental assessment describes it as man-made. Source: City packet.
What does Florida law require for large water uses?
A large-scale data center, 50 MW or more at one location, cannot be issued a water allocation if the use would harm the area’s water resources or conflicts with local zoning and the comprehensive plan. At 100,000 gallons a day or more it must disclose all sources, amounts and losses, file a conservation plan and go through a public hearing.
More detail
The conservation plan includes recycling cooling water before discharge, a leak-detection and repair program, water-efficient fixtures and an employee education program. The district must require reclaimed water instead of groundwater or surface water when a suitable source is available at the boundary with enough capacity, is accessible, is feasible and does not conflict with a discharge permit. Changes to a permit get the same review as the original. The statute governs permits to withdraw water. Water bought from a utility that already holds a permit is a separate question the statute does not address, and implementing rules had not been published as of October 5, 2026. Sources: §373.262; §373.239; Chapter 2026-65.
Could this affect groundwater or cause sinkholes?
Groundwater and sinkhole risk are site-specific, and Florida sits on limestone. A hydrogeologic review is part of how the water district evaluates a water-use permit.
More detail
The draft conditions add periodic water testing and reporting, including sealed water-balance testing.
Could reclaimed water be used?
Florida law requires it where a suitable source is available and feasible. Loudoun Water, a public utility, built a reclaimed-water system for cooling and irrigation that delivered more than 750 million gallons in 2025.
More detail
Whether a reclaimed source reaches this site is part of the water-use permit review. Sources: Loudoun Water; §373.262.
Sound, neighbors and safety
8 questions
How is sound controlled?
With distance, equipment placement, enclosures and screening, and measurable limits in the approval. I‑95 already adds continuous traffic sound at the site.
More detail
Data centers make sound from cooling equipment, transformers and generator testing. Loudoun County reports that complaints often concern tonal and low-frequency sound that dBA limits do not capture. The City’s general noise table does not apply to uses in industrial districts (Sec. 26-41(a)(12)), so the draft conditions set project-specific limits in dBA and dBC at the property line and at residential boundaries, with separate night limits, baseline measurements before operation and periodic testing. The limit values are still to be set. Sources: Loudoun County; draft conditions.
How close is Willow Lakes to neighborhoods?
About 1,340 feet to the nearest rural homesites to the west and about 1,700 feet to the nearest finished home lot in Wylder, measured from the property line. Buildings and equipment would sit farther inside.
More detail
| Neighbor | From the property line |
|---|---|
| FPL Midway Substation parcel, across Midway Road | about 200 feet |
| Nearest rural homesites, west of the canal | about 1,340 feet |
| Wylder, platted vacant residential lots | about 1,280 feet (lots without homes) |
| Wylder, nearest completed townhome lot | about 1,700 feet |
| Wylder single-family area | about 4,230 feet |
| Port St. Lucie platted homes (Section 47) | about 5,000 feet |
How these were measured. From St. Lucie County Property Appraiser parcel data (queried October 5, 2026), the shortest distance between the Willow Lakes parcel boundary and each neighboring lot boundary, counting a lot as a home when County records show finished area. They are the project team’s own measurements, not City measurements. Distances from future buildings are measured once a site plan exists. Farmland and vacant commercial parcels adjoin the property to the north and west.
What are backup generators used for?
To keep a facility running if utility power fails, as hospitals and other critical facilities do. The draft conditions limit them to emergencies, commissioning, scheduled maintenance and required testing, and prohibit routine power use and peak shaving.
More detail
Routine testing would be limited to weekdays from 10 a.m. to 4 p.m., with enclosures, state air permits and operating records kept five years. Loudoun reports more than 4,000 permitted generators across 200-plus data centers, about 2 MW each and usually tested about an hour a week. The count, fuel and capacity for Willow Lakes are set in final engineering. Source: Loudoun County.
What happens during hurricanes?
Every building is permitted under the Florida Building Code, including its wind requirements, and fuel storage and electrical systems must meet fire and electrical codes. Storm-resilience design is part of the engineering that comes with the site plan.
More detail
Stormwater is permitted separately. The water district’s environmental resource permit evaluates flooding to neighbors, water quality and wetland impacts, and the conditional-use application shows stormwater areas on the development plan.
Can local fire and EMS respond to a fire at a data center?
The fire district determines what equipment and training are needed, and the draft conditions require an emergency-response plan with the application. Loudoun County reports that battery fires need a specialized response and bought specialized equipment and wrote an emergency-response manual.
More detail
The draft conditions carry emergency-response design into the final site plan and apply fire, building and hazardous-material requirements to battery storage. Source: Loudoun County.
What about traffic and construction?
Once operating, the proposed uses are estimated to generate 22,920 net new daily trips, 38 percent fewer than the 37,297 trips the approved Planned Development would generate. Construction is the busiest period and is temporary.
More detail
These figures come from the applicant’s June 2026 traffic memo. The St. Lucie Transportation Planning Organization has asked for a current analysis that includes nearby approved projects, and County Public Works has asked for a third-party review. The draft conditions require a construction management plan covering hours, haul routes, parking, dust, noise, road protection and public communication. Source: City packet.
What about wildlife, wetlands and the creek?
A May 2026 environmental assessment describes about 200 acres of mostly improved and woodland pasture, a 19.6-acre reservoir and 3.7 acres of freshwater marsh. It observed no listed species during a May 2026 site visit and places the site within the North St. Lucie River Water Control District.
More detail
Wetland, stormwater and species permitting continues through the water management district and state agencies as the design advances.
Will it affect my property value?
No study of this site exists. Brookings reports home prices rose a modest 2 to 5 percent in counties that received data centers. Loudoun County says no housing-price effect from proximity is apparent, while noting that a tight housing market makes it hard to see.
More detail
Virginia’s state review found that industrial-scale data centers are largely incompatible with residential uses when sited beside them, which is why distance and conditions matter. Sources: Brookings; Loudoun County; Virginia JLARC.
Taxes and incentives
3 questions
Are there tax incentives?
Florida has a statewide sales-tax exemption for qualifying data-center property, which requires 100 MW of critical IT load and $150 million of capital investment and is granted by state certificate. Local property-tax exemptions are optional and require a voter referendum. Florida law does not require a local incentive.
More detail
The team’s position is that any local incentive, subsidy or extraordinary public expenditure should be disclosed, quantified and evaluated publicly before approval. Brookings reports incentives averaged about 2 percent of construction investment in hyperscale counties and 62 percent in colocation counties, and says siting follows power, land and fiber rather than tax breaks. Sources: §212.08(5)(r); §196.1995; Brookings.
Can a project like this be kept secret?
Economic-development agencies may keep a company’s location plans confidential for 12 months after a written request. The 2026 law removed the additional 12-month extension that other projects can still receive. Rezoning applications, planning materials and permit filings are public records.
More detail
Proprietary business information stays protected. Source: Fla. Stat. §288.075.
What could property taxes look like?
At an assumed taxable assessed value of $2 billion, current rates produce about $48 million a year across all taxing authorities, about $13.8 million of it for the City.
More detail
Illustrative annual property-tax revenue at an assumed taxable assessed value of $2 billion. The assessed value is an assumption. The St. Lucie County Property Appraiser sets the actual value of buildings and equipment, and it is not the amount invested. No exemptions or abatements are assumed. Rates are the 2025 millage rates for the City of Fort Pierce and change each year. St. Lucie County Property Appraiser
| Taxing authority | Mills | Annual revenue |
|---|---|---|
| City of Fort Pierce | 6.9000 | $13,800,000 |
| School system & Children’s Services Council | 6.6645 | $13,329,000 |
| County general fund | 4.1985 | $8,397,000 |
| Fire district | 3.0000 | $6,000,000 |
| Law enforcement & jail | 2.7294 | $5,458,800 |
| Water management & mosquito control | 0.3653 | $730,600 |
| County parks & public transit | 0.2500 | $500,000 |
| Erosion & stormwater management | 0.1000 | $200,000 |
| Florida Inland Navigation District | 0.0270 | $54,000 |
| Total | 24.2347 | $48,469,400 |
Jobs and other communities
6 questions
How many jobs do data centers create?
Construction employs the most people for the shortest time, and operations employ a smaller team permanently. Virginia’s state review found about 1,500 workers on site at peak construction and about 50 full-time workers at a typical 250,000-square-foot facility. Brookings finds roughly 100 to 200 jobs in a typical county that receives its first large data center.
More detail
Brookings (updated August 10, 2026) also finds data-processing employment up 56 percent and telecommunications up 43 percent over the first decade, with telecommunications gains in hyperscale counties only. Those are percentages of small sectors, and wages were unchanged. Brookings revised its earlier findings after expanding its sample, and the current version is the one used here. A separate August 2026 working paper by one of the same authors, which Brookings does not link as the source of its brief, finds little evidence of local spillovers such as higher wages.
The developer’s employment brief estimates 225 to 300 permanent on-site jobs, 1,500 to 2,200 regional jobs supported once indirect and induced jobs are counted, and 3,500 to 5,000 construction job-years over a two- to three-year build. It assumes a 450 MW, 1.32-million-square-foot campus and typical multipliers of 3.5 to 5.0. Open the employment brief (PDF). Sources: Brookings; Wright working paper; Virginia JLARC.
What would the jobs pay?
The employment brief estimates a weighted average base salary of about $102,000 for permanent on-site roles, and $130,000 to $140,000 with benefits and bonuses. St. Lucie County’s median household income is $71,457.
More detail
| Role | Estimated base salary |
|---|---|
| Site director, operations management | $160,000 to $210,000 |
| Mission-critical MEP engineers | $105,000 to $135,000 |
| Network and security infrastructure engineers | $100,000 to $130,000 |
| HVAC and liquid-cooling technicians | $85,000 to $110,000 |
| Data center and hardware technicians | $75,000 to $95,000 |
| EHS, logistics and inventory managers | $70,000 to $90,000 |
| Physical security and access control | $55,000 to $70,000 |
These are developer estimates for a 450 MW, 1.32-million-square-foot campus. The median household income is from the U.S. Census Bureau’s 2020 to 2024 American Community Survey, in 2024 dollars. Sources: Employment brief (PDF); U.S. Census Bureau.
What happened in Loudoun County?
Loudoun is the largest data-center cluster in the country. Its data centers produced $1.2 billion in property tax revenue in FY2026, 39 percent of the county’s overall budget, while the county lowered its real-property tax rate and added services. It also learned lessons about siting.
More detail
Outcomes the county reports. About 233 buildings and 56.5 million square feet as of March 1, 2026. The real-property tax rate fell from $1.145 per $100 in 2016 to $0.805 in 2026, and the county eliminated a $25 vehicle license fee and cut its vehicle tax rate. It credits the revenue with school budget increases of tens of millions of dollars a year and with the Sheriff, fire and rescue, libraries, parks and community centers. The FY2027 budget fully funds a $105 million increase for the school division. Individual homeowner tax bills varied with property values.
Lessons the county reports. From 2000 the county treated data centers like offices, so they were allowed by right wherever offices were, and some were built near homes. In March 2025 the Board ended by-right approval and made data centers a conditional use needing a special exception. The county’s ordinance requires noise studies before and after construction, and it is drafting standards for siting, noise, substations, battery storage and on-site generation. Noise complaints, often about tonal sound, are among the most persistent issues it hears. The county also says growth in data-center revenue will plateau in five to ten years and that it must not depend on a single source, and its adopted budget creates a revenue stabilization fund. On September 15, 2026 the Board voted to consider pausing action on new applications.
The FY2027 figure of $1.3 billion (40 percent) is a budget projection. Loudoun is far larger than a single campus, so it shows what a mature market produces and the siting lessons that apply to any site. Sources: The Loudoun Story; Tax revenues; Land use; Noise; FY2027 school funding release; Lessons-learned fact sheet; Data center standards project.
What have other host communities reported?
Henrico County lowered the price of new homes for first-time buyers, New Albany funded a park and police expansion, Louisa County cut its vehicle tax rate, and Quincy, Washington, lowered its levy rate about 70 percent. Each is described on the home page with its source.
More detail
- Henrico: planning staff concluded that concentrating data centers on suitable large sites kept direct effects on residents low, and recommended noise studies and a 200-foot setback from residential property. Planning staff analysis
- New Albany: the city, host to data centers since 2010, publishes the noise complaints it received in 2025 and 2026 and the mitigation under way. City of New Albany
- Other states’ cost rules do not govern Florida, and they show how regulators handle the same question: Virginia created a large-load class with a 14-year commitment and at least 85 percent payment of transmission and distribution costs, Georgia allows special terms above 100 MW, and Ohio’s AEP tariff requires payment for at least 85 percent of subscribed capacity for up to 12 years. Virginia SCC; Georgia PSC; PUCO
- Water reporting: Utah requires qualifying data centers to report expected and actual water use. Utah Division of Water Rights
What opportunities exist for local contractors?
Site work, construction, electrical, mechanical and HVAC, engineering, fiber, security, facilities, maintenance, landscaping and professional services are typical needs on a project like this. You can register your interest.
What else could be built here?
The property holds a 2020 Planned Development approval for a mixed-use village with up to about 1,000 homes, a 600-room hotel, 250,000 square feet of retail and a water park. A data center needs far more electricity and far fewer people on the property.
More detail
| Category | Data center | Warehouse or light industry | Approved mixed-use village (2020) |
|---|---|---|---|
| Traffic | Estimated 22,920 net new daily trips | Often high freight traffic | 37,297 daily trips (2026 memo); 37,828 in the 2020 analysis |
| People on site | Low | Moderate to high | Residents, guests and shoppers |
| Permanent jobs | Fewer per building than most alternatives | Often more per building | Retail and hospitality |
| Power | Very large | Generally much less | Conventional |
| Schools and public services | Little direct residential demand | Indirect | Direct, from about 1,000 homes |
The 2020 traffic analysis was sealed by Susan E. O’Rourke, P.E., on July 22, 2020, using ITE 10th Edition methods.
Local control
3 questions
Can Fort Pierce impose conditions?
Yes. Florida expressly preserves local authority over comprehensive planning and land-development regulation for data centers and other large-load customers (§163.326). Conditions become part of the approval and run with the land.
More detail
One question the City is resolving. City staff told the Planning Board that SB 180, a hurricane-recovery law, may temporarily limit adopting new, stricter standards until about October 2027, and asked for a City Attorney opinion on how it interacts with the 2026 data-center law. The answer will determine which of the draft conditions the City adopts as written and which come through a covenant or other approval terms. Source: City packet, staff notes.
Why does the City need new rules?
The zoning code has no data-center use today. Staff recommended that the City Commission decide how the use is classified and regulated before assigning it to a district, because the decision would apply to every light-industrial parcel in the City. The applicant asked to table so that process can go first.
How can I follow the process?
Read the City’s agendas and meeting video, and ask the Planning Department to notify you of hearings.
More detail
Planning Department, 100 North U.S. 1, planning@cityoffortpierce.com, 772-467-3737, referencing PZZAM2026-00002. Agendas and packets: AgendaQuick, Planning Board. Meeting video: City video archive. The Status & Documents page has the full list.
Ask
Ask a question
If your question isn’t answered here, send it to the Willow Lakes team.